Type of content created:
FLSmidth Sustainability Report 2022
Planning, sourcing content and writing
Blue Note Consultants website
DEME CEO: Driving down offshore wind costs
The essence is our speciality within certain niches and that we aim to be the best in those niches. Our dredging background has given us knowhow within different areas, such as the seabed, sea conditions and other marine environment factors as well as the associated technologies.
DESMI helicopter fuelling steps up the pace
Pump manufacturer DESMI’s Steve Godwin is looking very pleased. He’s standing on the deck of a naval ship, monitoring events closely as a helicopter hangs in the air just metres off the vessel’s port side, swaying gently in the relatively light easterly wind. As we watch, a line is winched down from the chopper to several crew members crouched on deck.
How to overcome technical constraints of the offshore wind lifting process
The lifting process on jack-up vessels is a key process in any offshore wind turbine installation or maintenance project. Control systems such as tagline systems are a necessary part of the lifting setup.
Alain Bernard: Why offshore wind needs innovation
In an exclusive interview with High Wind Challenge, DEME Group CEO Alain Bernard, explains why innovation is needed for the offshore wind industry to advance and that true innovation will only happen with greater collaboration across the industry.
Reducing weather downtime in offshore wind turbine installation
Recent advancements in technology can bring about a long-awaited positive development in the offshore wind industry: reducing weather risk associated with offshore wind turbine installation.
Next generation evacuation design
Robust calculation model for offshore wind turbine cost reductions
The cost of the wind turbine installation setup is an important factor in the quest to reduce the levelised cost of energy (LCOE). Research and development within new technologies is key to making installation quicker, more reliable and safer.
Palsgaard CSR report 2015
How to calculate wind effects in large blade lifts
The installation of offshore wind turbine components has traditionally been limited by metocean factors such as spudcan impact during jacking, crane dynamic amplification factors and, of course, wind effects.
